A complex fishing job requires an unusual procedure, means thinking out of the box to provide innovative solution. MB-LINES sets an adequate procedure for a complex fishing job in order to be completed successfully. Our dedicate personnel with a fit for purpose tools facilitate a fishing job execution.
– Fishing Head Locator Tool
– Short catch Overshot
– Heavy duty Coupling Overshot
– Releasable Internal spear
– Heavy duty releasable Coiled tubing Overshot
– Wireline cable head fishing tool
– Heavy Duty Side Wall Cutter
– Tubing punch orienting Adapter
A complete new design of ESP/ESPCP Shuttle system to convert ESP/PCP rig deployment to rigless deployment. The rigless deployment comply with a two barriers well control philosophy during pump replacement operations and allow the following
– ESP TDV Positioning tool :
Fit to purpose Tools, designed to position a check valve of ESP “Tubing Drain Valve” in a production position (close on annulus). Allow ESP flushing job to be conducted and restart the pump, when downhole condition will be stable, a tool can be retrieved. The tool is lowered and retrieved via Slickline.
– SCSSV Sure-set Retrievable Lock Open Tool :
Tool Designed to be installed via slickline to lock open the SCSSV and allows SLK, WL, CTU operations to be conducted safely.
When offshore aged wells Cease production, it will require well abandonment operation, usually a side track is planned to drill a new well using the existing slot. In many cases, casing slot integrity is damaged due to casing pipe corrosion and cement disintegration, therefore a replacement of casing pipe will be mandatory.
– Complex fishing jobs
– New Technology implementation
– Rigless ESP
– Contract tendering
– Well intervention contingencies